SaleSave -33%

EVM 1TB M.2 PCIE SSD (2280)

About this item

  • Capacity: 1TB
  • Read Speeds: 2500MB/s
  • Write Speeds: 2000MB/s
  • Form Factor: NVME (2280)

Original price was: ₹19,508.Current price is: ₹13,005.

Incl Tax

Incl Tax

Availability: In stock

Buy Now
Product Page Icons

Chat | +919082468103

Authorized Dealer

EVM 1TB M.2 PCIE SSD (2280)

Enhance your system’s performance with the EVM 1TB M.2 NVMe PCIe SSD, engineered to deliver exceptional speed and reliability. Perfect for those who demand top-tier performance for gaming, multimedia, and professional applications, this SSD offers the following key features:

 


    • Capacity:

      1TB of high-speed storage, providing substantial space for your operating system, software, games, and files.

 


    • Form Factor:

      M.2 2280, a compact and versatile form factor that fits easily into a wide range of laptops and desktops.

 


    • Interface:

      NVMe PCIe Gen 3.0 x4, which supports faster data transfer rates compared to SATA SSDs, ensuring quicker boot times and improved system responsiveness.

 


    • Performance:

      Achieves impressive read speeds up to 3,000 MB/s and write speeds up to 2,500 MB/s, significantly reducing loading times and enhancing overall system performance.

 


    • Durability:

      Built with advanced 3D NAND flash memory technology, featuring wear leveling and ECC (Error-Correcting Code) to enhance data integrity and reliability.

 


    • Compatibility:

      Designed to work with most modern motherboards and devices that support M.2 NVMe PCIe SSDs, providing an easy and efficient upgrade path.

 


    • Installation:

      Simple installation with an M.2 slot interface, requiring minimal setup and making it a user-friendly option for both DIY upgrades and professional installations.

 

The EVM 1TB M.2 NVMe PCIe SSD delivers the speed and capacity you need to keep up with demanding tasks and applications. Upgrade your system today and experience faster boot times, quicker file transfers, and an overall boost in performance.


Brand
EVM

Capacity
1TB

Form factor
NVME 2280

Warranty
Limited 5-Years Warranty
Brand

EVM

Storage Type

Internal

Form Factor

M.2

Capacity

1TB

Warranty

Limited 5-year

0 / 5

00 Reviews

  • 5 Star 0%
  • 4 Star 0%
  • 3 Star 0%
  • 2 Star 0%
  • 1 Star 0%

Reviews

There are no reviews yet.

Be the first to review “EVM 1TB M.2 PCIE SSD (2280)”

You may also like

Main Menu x
WhatsApp
EVM 1TB M.2 NVME PCIE SSD (2280)
EVM 1TB M.2 PCIE SSD (2280)
Original price was: ₹19,508.Current price is: ₹13,005.

Incl Tax