SaleSave -33%

EVM 128GB 2.5″ INCH SATA SSD

About this item

  • Capacity: 128GB
  • Read Speeds: 550MB/s
  • Write Speeds: 550MB/s
  • Hard Disk Form Factor: 2.5-inch SATA

Original price was: ₹3,409.Current price is: ₹2,273.

Incl Tax

Incl Tax

Availability: In stock

Buy Now
Product Page Icons

Chat | +919082468103

Authorized Dealer

The EVM 128GB 2.5″ SATA3 SSD is a high-performance internal solid-state drive designed for desktops and laptops. Built with next-generation 3D NAND Flash technology, it delivers faster boot times, quicker application loading, and improved overall system responsiveness compared to traditional hard disk drives. Its 2.5-inch form factor makes it an ideal upgrade for mainstream PCs, gaming systems, and business computers. The drive also features low power consumption, helping improve battery life in laptops.

Key Features

  • 128GB storage capacity for everyday computing.
  • High-speed SATA III (6 Gb/s) interface.
  • Up to 500 MB/s read and 340 MB/s write speeds.
  • Built with reliable 3D NAND Flash technology.
  • Up to 30× faster than traditional hard drives.
  • Fast boot-up, application loading, and file transfers.
  • Advanced SLC Cache Technology for enhanced performance and longer lifespan.
  • Low power consumption to help improve laptop battery life.
  • 2.5-inch 7mm slim form factor for easy installation.
  • Drive management software support for monitoring health, firmware updates, and performance optimization.
  • Designed for personal, gaming, and business PCs.
  • Limited 5-Year Warranty.

 


Brand
EVM

Capacity
128GB

Interface
SATA III (6 Gb/s), Backward Compatible with SATA II (3 Gb/s)

Form factor
2.5-inch (7mm)

Warranty
Limited 5-Years Warranty

Brand

EVM

Storage Type

Internal

Form Factor

M.2 2280

Capacity

128GB

Warranty

Limited 5-Years Warranty

0 / 5

00 Reviews

  • 5 Star 0%
  • 4 Star 0%
  • 3 Star 0%
  • 2 Star 0%
  • 1 Star 0%

Reviews

There are no reviews yet.

Be the first to review “EVM 128GB 2.5″ INCH SATA SSD”

You may also like

Main Menu x
WhatsApp
EVM 128GB 2.5 INCH SATA SSD
EVM 128GB 2.5" INCH SATA SSD
Original price was: ₹3,409.Current price is: ₹2,273.

Incl Tax