SaleSave -33%Sold out

EVM 4TB SSD – 2.5 Inch SATA

About this item

  • Capacity: 4TB
  • Read Speeds: 550MB/s
  • Write Speeds: 500MB/s
  • Hard Disk Form Factor: 2.5 Inches

Original price was: ₹83,033.Current price is: ₹55,355.

Incl Tax

Incl Tax

Availability: Out of stock

Product Page Icons

Chat | +919082468103

Authorized Dealer

EVM 4TB SSD – 2.5 Inch SATA

 

 

    • EVM 4TB SSD is a 2.5-inch SATA solid-state drive designed for high-performance storage.

 

    • It offers faster boot-up and load times compared to traditional hard drives, thanks to its solid-state technology.

 

    • The SSD has a read speed of up to 500MB/s, allowing for quick access to data and files.

 

    • It also provides impressive write speeds of up to 340MB/s, ensuring efficient data transfer and storage.

 

    • The 4TB storage capacity offers ample space for storing operating systems, applications, and files

 

 


Brand
EVM

Interface
SATA 3.0 Gb/s, SATA 6.0 Gb/s

Capacity
4 TB

Form factor
2.5 Inch

Warranty
Limited 5-Years Warranty
Brand

EVM

Storage Type

Internal

Form Factor

2.5 INCH

Capacity

4 TB

Warranty

Limited 5-year

0 / 5

00 Reviews

  • 5 Star 0%
  • 4 Star 0%
  • 3 Star 0%
  • 2 Star 0%
  • 1 Star 0%

Reviews

There are no reviews yet.

Be the first to review “EVM 4TB SSD – 2.5 Inch SATA”

You may also like

Main Menu x
WhatsApp
EVM 4TB SSD - 2.5 Inch SATA
EVM 4TB SSD - 2.5 Inch SATA
Original price was: ₹83,033.Current price is: ₹55,355.

Incl Tax